Pricing

What Affects the Cost of Your Bathroom Renovation?

Overview

At a glance

Budget Friendly

Price guide
$15k – $25k
Typical size
Usually under 3m²
Layout
Stays the same
Best for
Rentals, investment properties, a simple refresh

Mid Range

Price guide
$25k – $35k
Typical size
Usually 3m² – 6m²
Layout
Some changes
Best for
Family homes, long-term value

Luxury

Price guide
$35k+
Typical size
Usually over 6m²
Layout
Full redesign
Best for
A custom, high-end bathroom

Room size is a guide, not a rule. A small ensuite can still have luxury finishes, and a large bathroom can be done on a budget. Your final price depends on both the size of the room and the finishes you choose.

Part 1

Your existing bathroom

Before we design anything, we look at what's already there. These factors set the starting cost.

Budget Friendly

Room sizeMore space means more tiles, more waterproofing and more labour.
Usually under 3m²
Room shapeSquare rooms are faster to tile. Angles, nooks and sloped ceilings need extra cutting.
Standard rectangle (e.g. 1.8 x 1m, 2 x 1m, 2.5 x 1.2m)
Fixtures being removedEach item removed takes time to disconnect and dispose of.
Shower and small basin only
How much is currently tiledRemoving old tiles is slow, heavy work, and more tiles means more rubbish removal.
Partly tiled walls
Wall typePlasterboard is quicker to work with. Solid brick takes longer to cut into for new pipes.
Usually plasterboard
Type of homeApartments add strata rules, lift bookings and limited work hours. Upstairs bathrooms mean carrying everything up and down.
Single-storey house

Mid Range

Room sizeMore space means more tiles, more waterproofing and more labour.
Usually 3m² – 6m²
Room shapeSquare rooms are faster to tile. Angles, nooks and sloped ceilings need extra cutting.
Standard or slightly irregular
Fixtures being removedEach item removed takes time to disconnect and dispose of.
Shower, basin, toilet, possibly a bath
How much is currently tiledRemoving old tiles is slow, heavy work, and more tiles means more rubbish removal.
Partly or fully tiled
Wall typePlasterboard is quicker to work with. Solid brick takes longer to cut into for new pipes.
Plasterboard or brick
Type of homeApartments add strata rules, lift bookings and limited work hours. Upstairs bathrooms mean carrying everything up and down.
House, unit or apartment

Luxury

Room sizeMore space means more tiles, more waterproofing and more labour.
Usually over 6m²
Room shapeSquare rooms are faster to tile. Angles, nooks and sloped ceilings need extra cutting.
Any shape
Fixtures being removedEach item removed takes time to disconnect and dispose of.
Multiple fixtures, bath, double vanity
How much is currently tiledRemoving old tiles is slow, heavy work, and more tiles means more rubbish removal.
Fully tiled, floor to ceiling
Wall typePlasterboard is quicker to work with. Solid brick takes longer to cut into for new pipes.
Plasterboard or brick
Type of homeApartments add strata rules, lift bookings and limited work hours. Upstairs bathrooms mean carrying everything up and down.
House, apartment or double-storey townhouse

Part 2

What you choose

These are the decisions that make the biggest difference between packages.

Budget Friendly

Amount of new tilingMore tiled area means more materials and labour.
Minimal: floor and wet areas only
Tile size and typeSmall mosaics and large heavy tiles take longer to lay than standard sizes.
Standard 300x600mm or 600x600mm
Tile patternPatterns need more cuts and careful setting out.
Simple straight lay
Tile edgesMitred edges (corners cut at 45° for a seamless finish) take far longer than fitting a trim.
Standard trims, no mitre cuts
LayoutMoving the toilet, shower or basin means moving pipes and drains.
No change
Shower baseA level, step-free shower needs the floor lowered and extra waterproofing.
Step-up shower base
Shower screenFrameless glass is thicker and custom-measured.
Fully framed screen
Shower setupExtra shower heads need more plumbing inside the wall.
Standard shower head
Shower niche (built-in shelf)It has to be framed, waterproofed and tiled.
None
Vanity and storageWall-hung and custom units need wall reinforcement and more fitting time.
Floor-standing vanity
ToiletWall-hung toilets need a hidden cistern built into the wall.
Existing or standard toilet
Tapware and fittingsPremium brands and special finishes cost more to buy.
Standard taps, towel rail and fittings
ElectricalNew wiring needs a licensed electrician.
None
DrainageHidden drains need tile cut precisely into the grate.
Standard floor waste
Painting
None
Bath
None

Mid Range

Amount of new tilingMore tiled area means more materials and labour.
Larger areas or a feature wall
Tile size and typeSmall mosaics and large heavy tiles take longer to lay than standard sizes.
Wider range, including mosaics and feature tiles
Tile patternPatterns need more cuts and careful setting out.
Brick, stacked or diamond pattern
Tile edgesMitred edges (corners cut at 45° for a seamless finish) take far longer than fitting a trim.
Some mitred corners
LayoutMoving the toilet, shower or basin means moving pipes and drains.
Some changes (e.g. bath replaced with a larger shower)
Shower baseA level, step-free shower needs the floor lowered and extra waterproofing.
Step-up base (level entry optional)
Shower screenFrameless glass is thicker and custom-measured.
Semi-frameless screen
Shower setupExtra shower heads need more plumbing inside the wall.
Shower and rail combo
Shower niche (built-in shelf)It has to be framed, waterproofed and tiled.
One niche
Vanity and storageWall-hung and custom units need wall reinforcement and more fitting time.
Wall-hung vanity with stone-look top
ToiletWall-hung toilets need a hidden cistern built into the wall.
New toilet suite
Tapware and fittingsPremium brands and special finishes cost more to buy.
Better-quality ranges
ElectricalNew wiring needs a licensed electrician.
New exhaust fan and ceiling light
DrainageHidden drains need tile cut precisely into the grate.
Standard or strip drain
Painting
Ceiling
Bath
Optional

Luxury

Amount of new tilingMore tiled area means more materials and labour.
Floor to ceiling throughout
Tile size and typeSmall mosaics and large heavy tiles take longer to lay than standard sizes.
Large-format, natural stone-look or designer tiles
Tile patternPatterns need more cuts and careful setting out.
Herringbone and other detailed patterns
Tile edgesMitred edges (corners cut at 45° for a seamless finish) take far longer than fitting a trim.
Mitred edges throughout
LayoutMoving the toilet, shower or basin means moving pipes and drains.
Full redesign around how you live
Shower baseA level, step-free shower needs the floor lowered and extra waterproofing.
Level, step-free entry
Shower screenFrameless glass is thicker and custom-measured.
Frameless panels, walk-in shower, custom glass
Shower setupExtra shower heads need more plumbing inside the wall.
Rain shower, dual shower heads
Shower niche (built-in shelf)It has to be framed, waterproofed and tiled.
Custom niches
Vanity and storageWall-hung and custom units need wall reinforcement and more fitting time.
Custom cabinetry with stone benchtop, recessed shaving cabinet
ToiletWall-hung toilets need a hidden cistern built into the wall.
Wall-hung toilet with in-wall cistern
Tapware and fittingsPremium brands and special finishes cost more to buy.
Premium brands in brushed brass, gunmetal and similar finishes
ElectricalNew wiring needs a licensed electrician.
Heated towel rail, underfloor heating, LED mirror, feature lighting
DrainageHidden drains need tile cut precisely into the grate.
Hidden tile-insert drains
Painting
Full room
Bath
Freestanding bath

Part 3

Extra costs that can apply to any package

We can't always see these until we inspect the bathroom or start demolition. They are quoted separately, on top of your package price, and we'll always talk to you before any extra work begins.

Asbestos
Common in homes built before 1990. It must be removed by a licensed asbestos removalist, as required by law.
Water damage
Leaks can rot floor joists, timber frames or the subfloor (especially in homes on stumps or joists). These must be repaired before new waterproofing goes down.
Old plumbing
Old galvanised or damaged pipes may need replacing to protect your new bathroom.

Every package

What's included in every package

  • Waterproofing to Australian Standards
  • Licensed plumbing
  • Licensed electrician
  • Proper wall and floor preparation
  • Full project management, from demolition to final clean
  • 7 years workmanship warranty

The price difference is in the finishes and the amount of change. It is never in the quality of the work you can't see.

Not sure which package fits? Book a 15 minute discovery call and we'll walk you through your options, with no pressure.

Book a 15 minute discovery call

Get in touch

Transform your vision into the perfect bathroom.

Begin your design consultation today. Send us a quick message & we'll be in touch ASAP. Servicing Melbourne & the South-East suburbs.